sideloader operator's training course

The largest forklift operator training website in the world
You can purchase my entire set of Instructor's training slides here
Image

Sideloader practical test - step 3

sideloader test step 3

The load is now de-stacked from the high level stack and the sideloader is driven back through the chicane at B. Once the machine has negotiated the chicane it is driven back through again and the load is deposited on the eye level stack.


Next Slide>>

Steering | Stacking | Testing